capacity Capacity of the Plant/Unit (at 100% capacity utilization)

15000


Year wise capacity utilization

image

Year

70%

image

Year

80%

image

Year

90%

image

Year

100%

image

year

100%


Raw Materials Required

entreprenuearship
  • Bamboo
  • Boric Borax
  • Super Glue
  • Colour/Dye agent
  • Miscellaneous items
  • Varnish/Lacquer
  • Food grade epoxy for inner lining

Final Product

Bamboo Glass

Infrastructure Required

image Shed

Plant & Machinery Required

  • Hand saws
  • Shaving knives
  • Flat/ round rasp file (set)
  • Bench Vice
  • Electric cross-cutter
  • Electric bamboo turning machine
  • Angle Grinder

Emploment Generation:

9 Hired labour – 8 semiskilled, 1 skilled

N.A.


Land (own) 0.00
Civil works and Buildings (500 sqft @200/sqft) 1.00
Machinery 0.63
Others 0.30
Sub-total (A) 1.93
Total Working Capital Req (B) 0.51
Total Project Cost 2.44
Amount Percentage
TERM LOAN (75% of A) 1.45 59.4%
WORKING CAPITAL (60% of B) 0.31 12.7%
Total Loan 1.75 72.1%
Equity 0.69 28%
Total Funds Required 2.44 100%

Financial Benchmarks

image

Year

image

Year

image

Year

image

Year

Target Revenue 13 15 17 19
Break Even Point 25.07% 21.42% 18.28% 15.85%
DSCR including Principal Repayment 13.72 9.06 11.42 14.23

Production of Bamboo Glass 8 labour will on average be able to produce 10 semi processed mugs per worker per day, working 300 days in a year. Price of one such Glass is assumed as Rs 80. Only the part with nodes shall be used. Rest may be used for other craft items. Roughly 80 Glasses shall be finished using the single turning machine. One skilled labour will work on the turning machine.
Machinery This is a profile of a household level enterprise with 9 hired labour.
Interest Rate Assumed 11%
Repayment Period 5 Years with 3 months moratorium
Training Institutes CBTC Meghalaya, BCDI Agartala, IIE Guwahati, TRIBAC
Whether the service is in the Negative list under NEIDS and MSME? No
background image